Taiyuan gas pipeline engineering

Pipeline starting point is XinZhang village of the city, the finish is high pressure gas station station east club, 31 km of pipe.This section of the pipeline along the northwest surrounding the city overall high speed and high voltage transmission line laying around, in north - west - south direction installation as a whole.

  In march, 2011, our company construction of cathodic protection  for taiyuan gas engineering (xiaodian-luocheng high pressure gas pipeline)

After grinding anticorrosive coating using aluminium heat welding cables and pipes